Council to close Bilgola South stairs after May storms — volunteers wanted Sunday at first light.
Two timber risers gone, a third loose. The Avalon Boardriders are organising sandbags and a small carpentry crew.
FT
♥ 412
Score 86
The southern stairs at Bilgola took a beating last week. By the time the high tide pulled back on Wednesday morning, two of the lower timber treads were gone entirely.
It will close on Monday morning unless we can stabilise the lower run. The plan is straightforward: sandbags around the support footings, a temporary timber brace, and a tarp over the top.
When
Sun 10 May06:30 sharp
Where
Bilgola SthLower carpark
Hands needed
14 + 2Sandbaggers · chippies
In return
Bacon roll+ pie + coffee
If you are coming, the Boardriders ask that you arrive a little before low tide so the lower platform is exposed.
“Save us the orange mesh and we'll save you the council fee.”
F. Tarrant · Avalon Boardriders
⌖ Bilgola South
⌖ NB
#climate
#workingbee
#thisweekend
86
Composite
Why this is high
Interaction71
Content · climate92
Author91
Locality88
Thread
JP
Jonas PeletierVerified
09:14
Gate's open from 06:00 Sunday. I've left two kettles and the long extension lead on the table inside.
♥ 64Reply
OB
CN
Council · NBOfficial
13:30
The works as described above are supported. Council retains responsibility for permanent reconstruction.